MPS Meadowbrook Intemediate

Mustang Intermediate School No. 3 was funded by the 2017 Mustang Public Schools Bond.  The construction consists of conventional structural steel framing and the storm shelter construction consists of precast concrete walls and a concrete lid.  Key project challenges included accelerated foundation design packages, design of canopies and attachment to structure, and designing a front curved façade entry.

360 Engineering Group provided services including structural design, project coordination, quality control, construction administration services.

Location

Yukon, Oklahoma

Size

78,000 SF

Construction Cost

$21,000,000

Professional Services

Accelerated Design Package

Structural Design and Analysis

Building Information Modeling

Project Type

K-12

Completion Date

2018