top of page

Greenwood Rising

Greenwood Rising is a world-class museum and history center dedicated to honoring the legacy of Black Wall Street and the Greenwood Massacre of 1921. The museum's location on Greenwood Avenue and Archer Street holds symbolic importance, standing on the very ground where Black Wall Street once flourished.

The building features a light up exterior façade, long cantilevered canopy, multiple slab steps and slab ribs. 360 developed a handful of new details for this type of façade support with an accelerated delivery schedule. 

360 Engineering Group provided services including structural design, project coordination, quality control, construction administration services for this project.  

Location

Tulsa, Oklahoma

Size

10,500 SF

Construction Cost

$4.2 million

Professional Services

Design Assists - Conceptual Design

Structural Design and Analysis

Building Information Modeling

Project Type

Museum

bottom of page