top of page

Amazon Sorting Facility

The Amazon Sorting Center was the first of its kind in Oklahoma City.  The structure integrates a pre-engineered metal roof structure with tilt-up concrete panels.  Key project challenges included designing wide-bay openings in load bearing tilt-up concrete panels, design embeds and coordinating roof structure attachments to concrete panels and designing all canopy attachments to structure.

360 Engineering Group provided services including structural design, project coordination, quality control, construction administration services, and shop drawings for these projects

Location

Oklahoma City, OK

Size

300,000 SF

Construction Cost

$3,000,000

Professional Services

Structural Design and Analysis

Accelerated Design package

Project Type

Industrial

Completion Date

2018

bottom of page