BAPS Timber Ridge Elementary
Broken Arrow Elementary No. 15 was funded by the 2015 Broken Arrow Public Schools Bond. The construction consists of conventional structural steel framing and the storm shelter construction consists of precast concrete walls and a concrete lid. Key project challenges included accelerated foundation design packages, design of canopies and attachment to structure, and the design of a curved metal façade entry.
360 Engineering Group provided services including structural design, project coordination, quality control, construction administration services.