MPS Meadowbrook Intemediate
Mustang Intermediate School No. 3 was funded by the 2017 Mustang Public Schools Bond. The construction consists of conventional structural steel framing and the storm shelter construction consists of precast concrete walls and a concrete lid. Key project challenges included accelerated foundation design packages, design of canopies and attachment to structure, and designing a front curved façade entry.
360 Engineering Group provided services including structural design, project coordination, quality control, construction administration services.