top of page

Bishop Arts Development Building F

The Archer Building, an anchor in the Tulsa Arts District, is home to art studios, apartments, and several locally owned retail and restaurant tenants.  Existing structural systems included a two-way concrete flat slab with drop panels and column capitals, a draped mesh concrete slab on steel lumber-joist roof, and a prestressed concrete girder and precast plank system.  Key project challenges included structural reinforcement of an existing roof system for outdoor assembly space use, structural reinforcement around new floor openings for elevator shafts and mechanical chases, and a 550 square foot basement expansion.

Location

Dallas, TX

Size

7,100 SF

Construction Cost

$

Professional Services

Structural Design and Analysis

CFMF Specialty Engineering

Project Type

Retail

Completion Date

2018

360 Engineering provided documentation and analysis of slab-on-grade and foundations, exterior wall systems, and misc. Structural Steel within a metal building structural frame system. Lateral frames, braced frames and roof systems were designed by metal building manufacturer.

bottom of page